Streambank Stabilization

Technical assistance is offered for bank stabilization best management practices including bioengineering with live willow stakes and natural channel design.  For more information, please contact Lenny Croote at 518-548-3991, This email address is being protected from spambots. You need JavaScript enabled to view it..

  • 1a
  • 1b
  • 1c
  • 1d
  • 1e
  • 1f
  • 1g
  • 2b
  • 2c
  • 3a
  • 3b
  • 3c
  • 4a
  • 4b
  • 4c
  • 4d
Watch the video Elbow Creek:  a Case Study in Natural Channel Design: